Qusahwira Full Field Development Project
Tonnage
- 700 tons
We have been awarded by Reyami steel to detail the process pipe racks for the oil field. We have modelled the pipe rack with miscellaneous such as platforms, stair handrail and ladders.
Tonnage
We have been awarded by Reyami steel to detail the process pipe racks for the oil field. We have modelled the pipe rack with miscellaneous such as platforms, stair handrail and ladders.